Building prevention
Construction disaster prevention
Pipe Repair: Equal Diameter Replacement Repair
Case Study Template
1. Project Name: Sewage Pipeline Repair Project at Shanghai Metro Fengbang Depot
Sewage pipeline repair using the pipe bursting method for equal diameter replacement. Construction location: Shentong Metro Fengbang Depot, Jiading District, Shanghai.
2. Construction Photos (3–5 images):
|
|
Pipe Bursting and Pulling Diagram | Pipe Thrusting Construction Diagram |
|
|
Replacement Completion Diagram | Post-Replacement Effect Diagram |
Project Overview: The W74-W78 section of the Shanghai Metro Line 14 Fengbang Depot experienced blockages due to pipeline settlement and jet grouting reinforcement. According to site investigations, a 3x3 meter shaft was constructed north of W78 using 9-meter-long Larsen steel sheet piles. A directional drilling rig was used in the W78 shaft to push a conical head through the original pipeline from the working shaft to the original W74 receiving shaft. During the pushing process, elevations were remeasured to ensure the head remained within the required pipeline.
Back reaming excavation utilized slurry balance technology with chemical mud. The back reaming drill bit and sewage PE pipe were installed in the receiving shaft, and the pipe was locked with a hydraulic jack before starting the back reaming drilling. The sewage pipes were dragged into place one by one to complete the installation.
This construction technique lies between directional drilling and slurry balance methods, where the drilling head does not lock onto the pipe, achieving the intermediate function of slurry balance. The pipe only bears the thrust resistance, featuring small space requirements, high construction efficiency, accurate elevation control, wide geological adaptability, and strong obstacle handling capabilities.
Project Challenges:
1) The original pipeline was excavated across the railway tracks of Shanghai Metro Line 14 Fengbang Depot, causing deformation and cement intrusion due to foundation reinforcement, making it impossible to repair using conventional UV curing methods.
2) The original DN300 sewage pipeline crosses vertically with a DN2000 stormwater pipe, with only 20 cm spacing.
3) Equal diameter replacement in the original pipeline position had no impact on metro traffic or road traffic.
Technical Advantages:
1) Does not affect existing underground utilities, roads, waterways, or surface buildings. Construction is noiseless and pollution-free, requiring minimal excavation area, suitable for 3-meter-wide roads, with a minimum working shaft diameter of 2.5 meters and a minimum receiving shaft diameter of 1.0 meter.
2) Cost-effective, ideal for lifting in confined spaces, compact size, powerful performance, fast thrust speed, excellent waterproofing, with a horizontal deviation of 30 mm during the entire thrusting process.
3) Utilizes high-precision visualized control of construction deviations, ensuring the entire process remains under control, achieving high efficiency and short project duration.
4) Suitable for use in soft soil, clay, sand, gravel, hard soil, backfill, etc. Particularly suitable for micro-pipe equal or expanded diameter replacement repairs without damaging above-ground structures in areas unsuitable for large-scale excavation.