Automatic pressure relief and anti-floating technology for underground structures: New basement on plot F01-06 in Pudong New Area

2026-01-08
1 views


Automatic Pressure-Relief Anti-Floatation Technology for Underground Structures: Pudong New Area Plot F01-06

Newly Constructed Basement


Project Overview

This project involved the construction of a new supermarket building with a total floor area of 18,910 m². The above-ground structure consists of a single story, and a full basement was constructed beneath the entire building, supported by a raft foundation over pile foundations. The bottom of the basement slab is located within Layer ③t (silty clay), which has a relatively high permeability coefficient and strong water conductivity.      Cause of basement uplift: After completion of the basement slab, heavy rainfall caused a sharp rise in groundwater buoyancy, resulting in an uplift of 10–45 mm across a central area of approximately 1,900 m². Based on site conditions, our company installed four sets of automatic pressure-relief anti-floatation systems. The basement is now in operation and exhibiting stable settlement.


Applicable Scenarios:

1. For existing buildings experiencing basement uplift, the automatic pressure-relief anti-floatation system can effectively resolve the issue.


2. For new constructions in areas with complex groundwater conditions, the system can be proactively installed to prevent potential basement uplift.

3. Historic or heritage-protected older buildings—many of which were constructed without anti-floatation measures—are now suffering from widespread uplift; this system offers an effective remediation solution.

Technical Advantages:

1. Requires no large-scale equipment, offers flexible installation locations, is not restricted by site conditions, and features a short construction schedule.

2. Enables real-time monitoring of water pressure and other parameters; automatically drains and relieves pressure when water pressure rises, reducing labor requirements.

The filter layer can be flushed or replaced, allowing the system to function permanently.

3. Causes minimal damage to the original structure and significantly reduces costs compared to traditional anti-floatation methods.