Foundation treatment project DCM project: Hong Kong third run project
Hong Kong Third Runway Project: Ground Improvement Works – DCM (Deep Cement Mixing) Engineering
The onshore ground improvement works for the Hong Kong International Airport Third Runway Project spanned from 2019 to 2021. The onshore DCM treatment covered an area of approximately 1.5 million square meters, with typical treatment depths ranging from 20 to 35 m. In areas where ground improvement exceeded 35 m in depth, CSM (Cutter Soil Mixing) was employed for reinforcement. Additionally, DJM (Deep Jet Mixing) was used in localized zones containing abundant gravel or underground obstructions.
The onshore DCM works utilized a four-shaft high-intensity mixing construction method, enabling effective control of unconfined compressive strength (UCS) at 1.2 MPa, representing internationally advanced construction technology.
Key Challenges:
1. The project employed an innovative four-shaft, 1.3 m diameter dual-direction (top-down and bottom-up) grouting cement-soil mixing pile technique—a pioneering method in China. Extensive preliminary testing and research were required to meet design specifications, posing a significant technical challenge to the engineering team;
2. The project had a tight schedule, massive scale, and stringent quality requirements, demanding exceptional performance from both equipment and personnel;
3. Logistics support was highly challenging: the construction site was located on an isolated offshore island, with certain areas falling within airport height-restricted zones. Strict compliance was required for equipment mobilization, staff commuting, and material transportation, resulting in a complex management process;
4. Complex geological conditions significantly increased construction difficulty: plastic drainage boards existed beneath the seabed, and a dense artificial sand crust layer was present near the surface, necessitating thorough equipment design and customization to enable successful penetration;
5. Material supply was difficult due to shallow water depths at the site, causing frequent grounding of cement transport vessels and grout supply barges. Moreover, the vast site area led to extremely long grout delivery distances, increasing the risk of pipeline blockages.