Ground treatment project DJM Engineering: Hong Kong Third Runway Project

2026-01-08
1 views

Hong Kong Third Runway Project: Ground Improvement Works – DJM (Deep Jet Mixing) Engineering

The onshore DJM works for the Hong Kong International Airport Third Runway Project were primarily located in areas such as the original seawall and sludge disposal zones, serving to address locations where DCM (Deep Cement Mixing) could not be implemented. The DJM treatment was required to achieve the same strength standard as DCM—exceeding 1.2 MPa—with a column diameter of 2.5 m. Therefore, the team employed advanced DJM equipment for construction. Additionally, a small number of non-compliant DCM columns were remediated using the DJM method.

Key Challenges:

1. The geological conditions in the DJM treatment zones were highly complex, resulting in significant construction difficulties. Pre-drilling was required in certain sections, and frequent issues such as drill rod jamming, grout loss, and localized collapses occurred;

2. The construction area was situated within the airport’s restricted and height-limited zones, requiring strict control over personnel and equipment access—posing high management complexity and operational risk;

3. The DJM zone was in close proximity to the original Runway 2. Construction had to minimize disturbance to surrounding structures; however, the design called for large-diameter columns with high strength requirements. When high injection pressure was applied, even minor deviations could potentially affect ground strata up to 50 meters away. Therefore, precise control of technical parameters—including injection pressure, orientation, and water-cement ratio—was essential, demanding exceptionally high technical expertise.