foundation treatment
pile foundation
Foundation treatment project: gravel pile project for a national storage and transportation base project in Zhejiang
Ground Improvement Project: Stone Column Works for a National Storage and Transportation Base in Zhejiang Province
The national storage and transportation base project in Zhejiang was formed by hydraulic reclamation, covering an area of 1 million square meters. The existing ground elevation ranges from approximately +0.2 m to +1.1 m. The yard area was treated according to the foundation standards for ore stockyards, resulting in an average handover elevation of 3.8 m after ground improvement. The site will be further leveled to the final design grade during subsequent construction phases.
The ground improvement zone covers approximately 200,000 square meters and primarily employs stone columns. The stone columns were constructed using the vibro-compaction (mandrel-driven) method. This technique provides soil displacement, compaction, and vibration densification effects depending on the soil type. In cohesive soils, it mainly acts through soil replacement, forming a composite foundation with the columns and surrounding soil, thereby increasing bearing capacity, reducing settlement, and mitigating potential soil liquefaction.
Project Challenges:
1. The project utilized stone columns with a diameter of 1.0 m—larger than the conventional 0.8 m diameter—posing greater challenges in hole formation, column installation, and quality control.
2. The project is large in scale, has a tight schedule, and is located in a remote area, requiring the deployment of more than 20 large pieces of equipment, significantly increasing construction coordination complexity;
3. The design requires treatment depths exceeding 25 m, necessitating taller and more powerful equipment. Additionally, the increased column diameter demands higher-capacity vibratory hammers to achieve penetration, placing stricter requirements on equipment stability and reliability.