Reverse approach and “one pile, one pillar” project: Obstetrics and Gynecology Hospital Affiliated to Zhejiang University School of Medicine Project
Top-Down Construction and One-Pile-One-Column Project: Women’s Hospital, School of Medicine, Zhejiang University
The project covers a site area of approximately 5,300 m², with a total building area of 42,201 m². It consists of 12 above-ground floors (total height 45 m) and 4 basement levels. The excavation depth is 22.80 m, and the pit is classified as Grade I in terms of safety level. The retaining system employs a top-down construction method using diaphragm walls, with a one-pile-one-column foundation system. Trench wall reinforcement and waterproofing primarily utilize triple-axis cement-soil mixing piles with inserted steel H-beams.
Key Challenges Addressed:
1. Top-down construction is highly complex; during construction, continuous settlement of the diaphragm walls may occur, potentially causing structural cracks that affect normal use or even compromise structural safety;
2. Under the site’s geological conditions, both the piles and diaphragm walls penetrate into moderately weathered andesite porphyry, which has an average uniaxial compressive strength of 34.07 MPa and a standard value of 29.68 MPa, making drilling and installation extremely challenging;
3. To the south of the site stands Building No. 8 Yuewang Road—a Republican-era structure listed among Hangzhou’s first batch of historically protected buildings—requiring special monitoring and protective measures during construction;
4. The construction site is limited in size, restricting the layout of soil removal openings. Site traffic is further constrained by the presence of the first-floor slab, local elevation differences within the excavation, and design-imposed limits on live loads, resulting in low utilization efficiency of the soil removal openings.