84-meter ultra-deep ground wall "two walls in one" project: connecting the three rivers in Jieyang, Guangdong
84-Meter Ultra-Deep Diaphragm Wall “Two-Walls-in-One” Project: Sanjiang Water System Interconnection, Jieyang, Guangdong
The follow-up optimization project of the Hanjiang–Rongjiang–Lianjiang River Basin Interconnection includes two single-bore shield-driven water conveyance tunnels with an internal diameter of 6.7 m, totaling 8.43 km in length. This project’s retaining works comprise an 84-meter ultra-deep diaphragm wall, ultra-deep MJS method piles up to 82 m in length, mixing piles, bored piles, and an excavation depth of 38.3 m.
The diaphragm wall reinforcement uses φ28 and φ25 rebars. The maximum panel width is 6.44 m, with a wall thickness of 1.0 m. The longest reinforcement cage measures 84 m, and the maximum excavation depth reaches 38.31 m. Rigid I-shaped steel connectors are used at panel joints. Within the shield tunnel portal zone, glass fiber-reinforced polymer (GFRP) rebars replace conventional steel rebars to facilitate subsequent shield tunneling.
Project Challenges:
1. The diaphragm wall reaches a maximum depth of 84 m, and the highly variable ground conditions impose stringent requirements on trench verticality;
2. The MJS method achieves a maximum depth of 76 m, with an effective pile length of 65.9 m, making precise control of verticality, grouting pressure, lifting speed, and grout volume extremely challenging;
3. The irregular-shaped diaphragm walls demand high precision in reinforcement cage fabrication and lifting installation, while also requiring exceptional trenching quality and stringent seepage control for the diaphragm wall system.