Foundation pit
foundation pit
MJS construction method and TRD construction method wall construction project: Shanghai Oral Disease Prevention and Treatment Institute Minhang Campus Project
MJS and TRD Method Wall Construction Project: Minhang Branch of Shanghai Stomatological Disease Prevention and Treatment Center
The total building area of this project is approximately 45,717 m², including about 33,083 m² of new above-ground construction and approximately 12,634 m² of new underground construction. The excavation measures roughly 88 m in east–west length, 127 m in north–south length, with a perimeter of about 420 m and an area of approximately 7,800 m². The waterproof curtain combines SMW method piles with TRD and MJS methods. Due to the tight construction space adjacent to the Children’s Hospital on the east side, the MJS method was adopted there,
while the TRD method was used for all other areas.
Project Challenges:
1. The eastern side is close to existing buildings, leaving a narrow working zone; therefore, the construction sequence must be carefully planned;
2. The triple-axis mixing piles reach a depth of 33 meters. Additionally, a neighboring excavation just 1 meter away has already been dug to 10 meters, resulting in very soft subsoil. Given the heavy self-weight of the equipment, steel plates and road mats were laid on the ground surface to reinforce bearing capacity;
3. Significant drawdown of confined aquifer water levels outside the pit requires timely groundwater monitoring, prompt implementation of countermeasures, and, if necessary, immediate installation of additional waterproof curtains.