Reverse method deep foundation pit project: Kunming Baiyun Road underground civil air defense and road comprehensive improvement project

2026-01-08
1 views

Top-Down Deep Excavation Project: Kunming Baiyun Road Underground Civil Defense and Road Comprehensive Renovation Project

The main structure of the project is located beneath Baiyun Road, oriented east–west, with a total length of 1,200 m and a gross floor area of 40,870.56 m². The project includes 36 underground civil defense access points, seamlessly connected to Baiyun Road Station on Kunming Metro Line 2, enabling underground interconnectivity among Wanhua Road, Zhiqiang Road, Beijing Road, Yiyuan Road, and Wanhong Road. Citizens can directly access the metro station via the underground civil defense facility for boarding trains. Part of the space has been developed into the "Beiyun 66" underground pedestrian street.

Project Challenges:

1. Top-down construction methodology was adopted in a bustling urban area to minimize disruption to city operations;

2. The project is situated at the intersection of Baiyun Road and Beijing Road, where underground utilities—including water supply, high-voltage power, low-voltage communications, and gas branch lines—are highly complex and densely intertwined;

3. A 110 kV electrical conduit exists on-site; to avoid damaging this critical infrastructure, significant manpower and resources were devoted to precise utility detection and protective measures.