Underwater PC construction method combined steel pipe pile project: "Yidian" Fangting Water Yard Pedestrian Bridge Deep Foundation Pit Project
Underwater PC Method Combined Steel Pipe Pile Project: Yidian Fangting Shuiyuan Pedestrian Bridge Deep Excavation Project
The deep excavation for the Yidian Fangting Shuiyuan Pedestrian Bridge is located at the tri-provincial boundary of the Yangtze River Delta, making it China’s first construction project spanning two provinces and one municipality. Serving as a “waterfront living room” for the three regions, the construction involved transporting 28-meter-long interlocking steel pipes by barge. The cofferdam piles range from 9 m to 28 m in length and consist of Ø820 interlocking steel pipe piles combined with Larssen sheet piles. A 400-ton mobile crane was used to lift and install the piles across a national highway—spanning two provinces in a single lift—overcoming countless logistical challenges to accomplish underwater piling and steel cofferdam installation.
Project Challenges:
1. The underwater steel pipe pile enclosure lacks an outer cofferdam; therefore, high-quality interlocks and tight engagement between piles must be ensured to achieve effective water-tightness;
2. The working area is extremely confined, requiring cargo unloading, equipment maintenance, lifting, and pile driving all within limited space;
3. The long pile lengths demand strict control of verticality; otherwise, closure at the interlock joints becomes difficult;
4. The schedule is tight and the workload heavy, necessitating completion of both vertical enclosure installation and horizontal bracing within a very limited timeframe.