Dual-liquid rapid setting micro-disturbance mixing pile patent application project: Shanghai Songhu Road Sanmen Road Interchange Project
Patented Dual-Liquid Rapid-Setting Low-Disturbance Mixing Pile Application Project: Songhu Road–Sanmen Road Underpass, Shanghai
Project Overview
Excavation of the pit removes overlying soil, reducing stress and potentially inducing upward deformation (heave) of the adjacent metro tunnel. Since the excavation crosses directly over the operational Metro Line 10, deformation control requirements are extremely stringent. The distance from the top of the tunnel is approximately 8 m, classifying this as a Class I deep excavation. The entire stratum consists of silty sand; dewatering would cause deformation of the metro tunnel, so a horizontal base-sealing and seepage cutoff system was adopted.
Project Challenges
1. The self-weight of mixing pile equipment can impose concentrated loads on the tunnel segment; therefore, steel plates thicker than 30 mm were laid beneath the equipment to distribute the load, and machinery was modified to reduce its overall weight;
2. Conventional mixing piles require a long time to achieve the strength of the in-situ soil, and early-stage soil liquefaction during this period could induce tunnel deformation. Therefore, our company’s patented dual-liquid rapid-setting low-disturbance mixing pile technology was employed to ensure the piles attain physical properties exceeding those of the original soil within the required timeframe.

Comparison Chart from Tongji University Experimental Results
Experimental Conclusion:
The dual-liquid rapid-setting low-disturbance mixing pile can achieve the strength of the in-situ soil within 4 hours, which is critically important for controlling ground disturbance and deformation, whereas conventional cement-soil mixing piles require 1 day.