Ultra-deep underground wall-deep foundation pit project: Hangzhou Qiantang Station Station Building Project

2026-01-08
1 views

Ultra-Deep Diaphragm Wall Excavation Project: Hangzhou Qiantang Railway Station Building Project

Located in Qiantang District, Hangzhou, the station building is bordered by Yipeng East 2nd Road to the east and Yipeng East 1st Road to the west, connecting directly to Toupeng Expressway. The standard excavation depth of the main pit ranges from 25.055 m to 23.866 m. The northern end shaft excavation depth varies between 26.911 m and 26.725 m, while the southern end shaft ranges from 25.515 m to 25.715 m. The overall excavation employs a two-stage sloping system with a 1:1.5 gradient, except at the northern end shaft, which uses a steeper 1:1 slope. The large excavation measures approximately 430 m in length and 127 m in width, with slopes stabilized by soil nailing and shotcrete. At the center lies a “pit-in-pit” for the metro station’s equipment and platform levels, supported by diaphragm walls and bored pile retaining systems, measuring about 396 m long and 26.2 m wide. The diaphragm wall reinforcement uses 32 mm and 28 mm rebars, with a maximum panel width of 6 m, wall thickness of 1.0 m, and the longest reinforcement cage reaching 68.1 m. Rigid I-beam joints are used for panel connections. Within the shield tunnel portal zones, glass fiber-reinforced polymer (GFRP) rebars replace conventional steel rebars to facilitate subsequent shield tunneling operations.

Project Challenges:

1. The upper portion of the diaphragm walls includes long empty (unfilled) trench segments, requiring stringent control during concrete placement;

2. Controlling artesian groundwater during excavation is highly challenging, making artesian water management the top priority of the project;

3. The excavation area is vast yet narrow and extremely deep, with a complex support system. Construction within the pit involves numerous interdependent work sequences, limited working space, and a large number of concurrent equipment deployments, significantly increasing the difficulty of construction planning and coordination.