Ground wall "two walls in one" project: commercial office project on plots O1A-01 and O1B-01 in Dinghai Community, Yangpu District

2026-01-08
1 views

Integrated Diaphragm Wall Project: Commercial and Office Development on Plots O1A-01 and O1B-01, Dinghai Community, Yangpu District

The project employs diaphragm walls, with all perimeter basement walls constructed as composite walls, 1,000/1,200 mm thick, and depths ranging from 50.0 m to 58.5 m. The structural (load-bearing) segment lengths vary from 43.0 m to 55.5 m, all utilizing cruciform steel plate joints. Prior to diaphragm wall construction, both inner and outer sides of the trench were reinforced using triple-axis soil mixing piles (diameter 3,850 mm; spacing @1,200 mm on the outer side and @1,800 mm on the inner side), with a cement content of 20%. The diaphragm walls penetrate 27.00 m to 30.00 m into the ground. At wall joints, 150° RJP (Rotary Jet Grouting) piles with a diameter of 2,600 mm and 40% cement content are installed for waterproofing, extending from 1.5 m above the base of the outer trench-reinforcement piles down to the bottom elevation of the diaphragm wall. The intermediate partition walls also use diaphragm walls, all temporary in nature, with thicknesses of 1,000/1,200 mm and depths of 43.0–55.5 m (entirely within the load-bearing segment). Except for Type D panels (adjacent to Tower T2), all use pipe-lock joints, with standard panel lengths of 5.0–6.0 m. The diaphragm wall reinforcement uses HTRB630 grade 32 mm and 28 mm rebars. The maximum panel width is 6.4 m, wall thickness is 1.0 m, and the longest reinforcement cage measures 58.75 m. The deepest excavation reaches 60 m, with joints formed by rigid cruciform steel plates connected to lock pipes.

Project Challenges:

1. The diaphragm walls are 1,000 mm / 1,200 mm thick, with a maximum depth of 58.5 m, requiring a verticality tolerance of 1/400—demanding extremely high precision and making verticality control highly challenging;

2. Maintaining slurry-supported trench stability is difficult due to the thick layer of miscellaneous fill at the surface, which is prone to collapse, making construction quality hard to guarantee;

3. Installing ultra-deep cruciform steel plates presents significant challenges in preventing grout flow disturbance and encounters high extraction resistance;

4. The heaviest reinforcement cage (including the cruciform steel plate) weighs approximately 76 tonnes; with lifting gear, the total lift weight reaches about 84 tonnes. This places exceptionally high demands on the overall rigidity of the cage, lifting equipment capacity, and safety during hoisting operations.