1. Project Name: Caisson Method Underground Parking Garage Project – Jiuting Town Government Multi-level Parking Garage
2. Construction Photos (3–5 images):
|
|
Schematic Design Plan |
|
|
|
|
|
3. Project Overview:
To address the shortage of parking spaces during government meetings while preserving surface green space, our company designed an underground multi-level parking garage. The project is located within the Jiuting Town Government compound in Songjiang District, Shanghai. The underground parking garage is situated on the west side, with the government office building to the east. A low-disturbance jacked caisson method was used to construct the underground parking facility, comprising three levels with 21 parking spaces per level, totaling 63 parking spaces.
Project Challenges:
1. The government office building is located immediately to the east, with the closest distance to the construction site being approximately 11 meters, requiring stringent control of building settlement;
2. The caisson has a large plan area measuring 31.6 m × 19.4 m, making it prone to lateral shift or tilting during sinking. To manage this high level of control difficulty, a matrix-type reaction force control system was employed to precisely regulate applied pressure and sinking displacement;
3. To prevent groundwater infiltration and ensure dry excavation conditions inside the caisson, the height of the internal soil plug was strictly controlled throughout the sinking process.