Pile pulling project: Shanghai Jiamin Line Municipal Support Project JMSZ-8 No. 12 Bridge Pile Pulling Project
Shanghai’s Closest Pile Extraction Project to an Operating Metro Line: Jiading–Minhang Line (Jiamin Line) of Shanghai Rail Transit Regional Network
Pile Extraction Work for Bridge No. 12 under Municipal Supporting Works Package JMSZ-8
This project scope includes the municipal supporting works related to the section of Bridge No. 12 on the Jiading–Minhang Line, covering road diversion and restoration during both temporary and final phases of construction (including road lighting facilities, temporary relocation and restoration of the four major underground utilities, associated pavement reconstruction, and bridge demolition and reconstruction).
The current construction involves extraction of bored piles beneath the foundation of Bridge No. 12. To enable the smooth tunneling of the Jiamin Line shield machine beneath Bridge No. 12, the affected cast-in-place piles must be removed. The closest pile extraction point is only 4 meters away from the operational section of Metro Line 14. Above the site runs a 220 kV high-voltage power line, and immediately to the south lies an 800 mm diameter gas main—creating a highly complex working environment.



Project Challenges:
1. The work site is only 4 meters from the operating Metro Line 15; pile extraction must ensure absolutely no impact on metro operations.
2. The site is just 1.5 meters from an 800 mm diameter main gas pipeline; pile extraction must guarantee no settlement or displacement of the gas pipe.
3. A 220 kV high-voltage transmission line passes directly overhead; strict adherence to safe clearance distances between equipment and the power line is required throughout construction.
4. The construction area lies directly in the middle of a former river channel, with poor ground conditions both at the surface and underground; special attention must be paid to equipment stability and subgrade bearing capacity.
5. Historic protected buildings are located within the construction site area.