Circular pipe jacking project in the section across the lake: Wuhan Tangxun Lake Sewage Treatment Plant tailwater drainage project
Circular Pipe Jacking Project Through Lake Section: Tailwater Discharge Project of Tangxun Lake Wastewater Treatment Plant, Wuhan City
The lake-crossing section of this project has a total length of 3,773.82 m, designed with four working shafts and three jacking runs. The pipeline burial depth ranges from approximately 10 to 19 m, with the longest single jacking run reaching 1,600 m. DN4000 mm reinforced concrete pipes are used, with an external diameter of 4,800 mm.
Project Challenges:
1. At the time of construction, the circular pipe jacking section was the largest-diameter and longest-drive circular pipe jacking project in Asia;
2. The pipe jacking passes underneath Tangxun Lake, the largest urban lake in Asia;
3. The geological conditions are highly complex, with diverse strata encountered, including strongly and moderately weathered argillaceous sandstone, silty clay, muddy silty clay, and mixed ground conditions featuring soft upper layers overlying hard lower strata.