Underground diaphragm wall project: Shanghai Rail Transit City Line 19 Engineering Civil Engineering No. 5 Huajing Road Station

2026-01-08
1 views

Diaphragm Wall Project: Huajing Road Station, Civil Works Package 5 of Shanghai Rail Transit Line 19

 

The station is located within Huajing Park at the northwest corner of the intersection of Huajing Road and Longwu Road, oriented east–west along Huajing Road. It is a two-level underground island-platform station with a main structure measuring 237.7 m × (22.34–36.69) m (internal clear dimensions). The station features two sets of ventilation shafts and three entrances/exits. At the platform center, the overburden above the roof slab is approximately 2.6 m, the bottom slab is buried to a depth of about 17.05 m, and the end shafts reach a burial depth of approximately 19.9 m. The standard section employs 800/1000 mm thick diaphragm walls, supported by five internal concrete braces plus one steel replacement brace; an additional short brace is installed in the locally deepened pits. Both the east and west end shafts serve as shield launching chambers. Immediately north of the station lies Huajing River (16 m wide, water surface elevation +2.57 m, water depth 0.9–1.8 m, with 0.4–0.8 m of silt on the riverbed, and riverbed elevation ranging from +1.07 m to –0.03 m).

 

Project Challenges

Challenges of Phase I of Taihe City Rail Transit Line 1

1、Complex geological conditions: The alignment traverses soft clay, sand layers, and bedrock, with localized zones of highly variable soil stiffness, posing significant challenges for shield tunneling and foundation pit support.

2、Tight schedule: The project faces substantial time pressure, requiring parallel execution of multiple work sequences and coordination across multiple construction packages, challenging resource allocation and progress management.

3、High technical requirements: The project integrates multiple construction methods—including shield tunneling, cut-and-cover, and top-down excavation—requiring strict compliance with design standards for waterproofing, structural integrity, and settlement control.

 

Road Retaining Structure (Bao Kan) Engineering Challenges

1、Complex terrain and geology: The alignment crosses mountains, hills, and plains, with sections encountering weak foundations and fractured rock masses, necessitating specialized construction measures.

2、Difficulty in quality control: Quality of rubble used in dry-stone masonry varies significantly, requiring enhanced site supervision; cast-in-place concrete work is highly susceptible to weather conditions, demanding effective contingency plans.

3、High stability requirements at structure transitions: The interface between the retaining wall and the road embankment must ensure stability to prevent differential settlement.