Deep foundation pit project next to the pipe gallery: China Railway Construction Lingang Building Project

2026-01-08
1 views

Deep Excavation Project Adjacent to Utility Tunnel: CRCC Lingang Tower Project

The foundation pit has a perimeter of approximately 472 m and an excavation area of about 13,660 m², with a typical excavation depth of 10.80 m and localized deeper zones ranging from 1.5 to 4.0 m. The construction environment is complex, situated close to underground utility tunnels, pipelines, and a river channel.

Underground utility tunnels are located within twice the excavation depth from the pit edge: one rectangular tunnel runs beneath Shuiyun Road to the north, and another beneath Yunjuan Road to the south. Both tunnels have a cross-section of 5.7 m × 4.0 m and a burial depth of 5.5 m, requiring protective measures during construction.

Project Challenges:

1. Underground utilities lie within 1 to 3 times the excavation depth from the pit, forming a highly complex network primarily comprising water supply, stormwater, power, street lighting, and gas lines—demanding extremely high construction precision;

2. The basement is very close to the site boundary (red line); temporary occupation of areas outside the red line is required during construction, resulting in limited working space. Careful coordination of overlapping work sequences is essential to meet the project schedule;

3. Proximity to the river poses additional challenges: the stone-masonry riverbank is only about 23 m east of the pit, interfering with triple-axis mixing pile installation and complicating groundwater control. Dewatering operations must be initiated well in advance of pile construction.