Foundation pit
foundation pit
Pile foundation and maintenance project: New primary school (tentative name) project on plot J-03 of Jiangpu Community
Jiangpu Community J-03 Plot New Primary School Project (Provisional Name)
The total site area of this project is 14,007.26 m², with a total building area of approximately 24,972.80 m², including approximately 16,234.40 m² of above-ground floor area and approximately 8,738.40 m² of underground floor area. The project utilizes slurry-supported bored cast-in-place piles as foundation piles, with pile diameters of 600 mm / 800 mm and lengths ranging from 40 m to 63 m. The designed pile top elevations range from –1.9 m to –6.9 m, with a total of 366 working piles. The test piles have diameters of 600 mm / 800 mm and lengths of 47 m / 70 m, with a designed pile top elevation of –0.05 m, totaling 18 test piles.
Project Challenges
The north side of the foundation pile enclosure is adjacent to Metro Line 8 tunnel, with a minimum clear distance of 10.8 m. During construction of the pile enclosure, disturbance to the metro tunnel must be minimized.
This is a redevelopment project; the original buildings have been fully demolished. According to site inspections, underground obstructions remain uncleared, requiring thorough clearance prior to construction.
The project is located in the central area of Yangpu District, immediately south of the Zhoujiazui Road Tunnel, imposing high environmental protection requirements.
The foundation and shoring works involve as many as nine different construction methods: bored cast-in-place piles, column piles, secant pile walls, triple-axis soil mixing piles, high-pressure jet grouting piles, double-axis soil mixing piles, Larssen steel sheet piles, and compaction grouting. Multiple techniques were carried out simultaneously throughout the construction period. With only a 3-month schedule, a large number of equipment and personnel were required for all processes, resulting in extensive cross-working activities.
The west side of the site borders Fengcheng Road sidewalk, the east side borders Huangxing Road sidewalk, and the north side borders Kongjiang Road sidewalk—all with high pedestrian traffic. Appropriate safety measures for nearby pedestrians must be implemented during construction.